Basement of Redpath Library Building closed as of March 28 for book move
La version française suit
As of March 28, 2024, books will begin to move from the basement of the Redpath Library Building to the Ã山ǿ¼é Collections Centre (MUCC). Until the day of the move, the floor will remain open, and the books and study spaces will be fully accessible.
After books move to the MUCC, they will be unavailable until the MUCC opens. As a result, the "Request/ Hold" button for items on the move or in the MUCC will not appear in the catalogue until the move is finished. The hold button to borrow from other Quebec libraries (Network Loans) and InterLibrary Loan will be available.
Find the most up-to-date information about the move and the schedule on our dedicated webpage.
Le sous-sol de l’édifice de la bibliothèque Redpath fermé pour le transport de livres
Le 28 mars, nous commencerons à déplacer des livres du sous-sol de la bibliothèque Redpath au Centre de collections de l’Université Ã山ǿ¼é. L’étage demeurera ouvert jusqu’au jour du déménagement, et ses livres comme ses espaces d’étude resteront à votre disposition.
Une fois les livres déplacés au Centre de collections, ils demeureront indisponibles jusqu’à l’ouverture de ce dernier. Par conséquent, pour les articles en train d’être déplacés ou déjà entreposés au Centre de collections, le bouton Request/ Hold (« Demander/Réserver ») n’apparaîtra dans le catalogue qu’une fois le déménagement terminé. Toutefois, le bouton de réservation permettant d’emprunter un livre dans d’autres bibliothèques du Québec (prêts du réseau) et le service de prêt entre bibliothèques demeurera affiché.
Pour trouver les derniers renseignements sur le déplacement des livres et le calendrier du projet, merci de visiter notre page Web.