缅北强奸

尘鈥檃产辞苍苍别谤

Construction Start: MNI - Cyclotron

缅北强奸 has mandated ARDEC to carry out the following project: Montreal Neurological Institute / 18-121 - Cyclotron.

The project consists of replacing the cyclotron's conduit.

Project manager:聽Eric Boutet, CIMA+ -聽eric.boutet [at] cima.ca

笔耻产濒颈茅: 17 May 2023

Construction Start: Bronfman Building - Parking infrastructure

缅北强奸 has mandated Concreate Construction to carry out the following project: Bronfman Building / 18-089 - Infrastructure for new parking equipment.

The project consists of the reparation of the existing ramp to solve water infiltration issues and the installation of new upgraded parking infrastructure.

Project manager:聽Andr茅 Labelle -聽andre.labelle [at] mcgill.ca

笔耻产濒颈茅: 17 May 2023

Construction Start: 680 Sherbrooke - Mock-up curtain wall

缅北强奸 has mandated Vitrerie RD to carry out the following project: 680 Sherbrooke / 18-106 - Mock-up curtain wall.

the project consists of the removal, survey of existing conditions and replacement of three existing window panels inside classroom 491, as well as between floors (panels above and below).

Project manager:聽Andr茅 Labelle - andre.labelle [at] mcgill.ca

笔耻产濒颈茅: 8 May 2023

Construction Start: Strathcona Music - Ceiling and door upgrades room E-109

缅北强奸 has mandated NR Brosseau Inc to carry out the following project: Strathcona Music / 18-101 - room E-109.

The project consists of acoustical work in room E-109 and includes the installation of a new door, door frame and new acoustic ceiling tiles.

Project manager:聽Wendy Rivera - wendy.rivera [at] mcgill.ca

Assistant project manager:聽Jeremy Elbaz - jeremy.elbaz [at] mcgill.ca

笔耻产濒颈茅: 5 May 2023

Construction Start: University Centre - Roof Replacement

缅北强奸 has mandated Couvertures St-L茅onard to carry out the following project:聽University Centre / 18-045 - roof replacement

The project consists in the replacement of the roof, skylights and storm drains.

Project managers:聽Eric Boutet, CIMA+ -聽eric.boutet [at] cima.ca

笔耻产濒颈茅: 25 Apr 2023

Construction Start: Strathcona Music Building - Building Envelope

缅北强奸 has mandated Atwill-Morin to carry out the following project:聽Strathcona Music Building/ 16-135 - Envelope Renovation.

笔耻产濒颈茅: 31 Mar 2023

Construction Start: Technical Services Building, Macdonald Campus

缅北强奸 has mandated Construction S茅lection SRJ Inc to carry out the following project:聽Technical Services Building, Macdonald Campus / 17-124 - Deferred Maintenance.

The project consist of upgrading the Welding Lab exhaust system and new teaching laboratory, as well as deferred maintenance repairs, including fire protection compliance, code compliance, mezzanine work, repairs to the envelope, installing a new ventilation unit, electrical work and civil work.

笔耻产濒颈茅: 13 Jan 2023

Construction Start: Bronfman Building - Computer lab 045-046

缅北强奸 has mandated Corenov Constructeurs to carry out聽the following project: Bronfman Building / 18-094 - Computer lab 045 -046.

The project will transform existing classrooms into two computer teaching labs with new audio visual equipment-reconfiguration. The scope includes the demolition of the back walls to include storage areas as part of the new teaching labs.

笔耻产濒颈茅: 14 Dec 2022

Construction Start: Frank Dawson Adams 鈥 Redesigns on floors 1 & 2 to welcome librarians鈥 offices

缅北强奸 has mandated Les Entreprises N.R. Brosseau Inc. to carry out the following project: Frank Dawson Adams / 21-036 - Redesigns on floors 1 & 2 to welcome librarians鈥 offices

笔耻产濒颈茅: 12 Dec 2022

Construction Start: Sylvan Adams Sports Science Institute

缅北强奸 has mandated Construction PCL Inc. to carry out the following project:聽Pine Avenue #527, 523, 517, 515 and 509 / 19-172 鈥 Sylvan Adams Sports Sciences Institute

The project consists of redeveloping four row houses 缅北强奸 owns on Pine Avenue to welcome the newly-created Sylvan Adams Sports Science Institute.

笔耻产濒颈茅: 25 Nov 2022

Construction Start: Bronfman Building - Dobson Center

缅北强奸 has mandated Construction SRJ to carry out the following project: Bronfman Building / 18-147 - Dobson Center project.

The renovation of the western end of the ground floor of the Desautels Faculty of Management鈥檚 Bronfman Building (1001 Sherbrooke St West) comprises the creation of a new Dobson Centre; the redesign of the Faculty鈥檚 mailroom and exam spaces; and the full renovation of the floor鈥檚 public washrooms.

笔耻产濒颈茅: 22 Nov 2022

Pages

Back to top