缅北强奸

subscribe

Construction Start: McCall MacBain Arts - Masonry work

Please be advised that 缅北强奸 has mandated Rainville et Fr猫res to carry out the following project:聽19-163 McCall MacBain Arts 鈥 Masonry work.

Final phase of the masonry restoration on two facades of the west side of the McCall MacBain Arts Building.

Construction start date: June 17th, 2024

Planned construction end date: September 17th, 2024

Work schedule: Monday to Friday, 6 a.m. to 3 p.m.

Published: 7 Jun 2024

Construction Start: Otto Maass Chemistry - CFI IF 2020, Cooke

Please be advised that 缅北强奸 has mandated Constructions Seni Inc. to carry out the following project:聽19-078 Otto Maass Chemistry 鈥 CFI IF 2020, Cooke.

The project consists of the transformation of the existing wet laboratory OM 025 into a dry laboratory to accommodate new class-4 lasers.

Construction start date: June 10, 2024

Planned construction end date: January 2025

Published: 31 May 2024

Construction Start: Reconstruction of Upper Main Road, Downtown Campus

Please be advised that 缅北强奸 has mandated Ceveco Inc. to carry out the following project:聽19-016 Reconstruction of Upper Main Road, Downtown Campus

This project consists of the reconstruction of the Upper Main Road, from the Y intersection to the McCall MacBain Arts Building, including underground work.

Construction start date: June 17, 2024

Planned construction end date: October 2025

Published: 29 May 2024

Construction Start: Burnside 鈥 Electrical distribution and infrastructure upgrade

Please be advised that 缅北强奸 has mandated C茅leb Construction lt茅e. to carry out the following project:聽17-004 Burnside 鈥 Electrical distribution and infrastructure upgrade.

The project consists of the upgrade of the vertical power distribution system. Includes mechanical, electrical, and architectural work.

Construction start date:聽June 2024

Planned construction end date:聽October 2025

Published: 24 May 2024

Construction Start: Lyman Duff 鈥 Gatehouse interior renovation

Please be advised that 缅北强奸 has mandated Corenov Constructeurs Inc. to carry out the following project:聽22-014 Lyman Duff (B169D) 鈥 Gatehouse interior renovation.

This project consists of a complete interior renovation of the Gatehouse to transform the wet labs into workstations and offices areas.

Construction start date:聽May 27, 2024*

Published: 24 May 2024

Construction Start: MNI & Duff 鈥 Envelope repairs

Please be advised that 缅北强奸 has mandated St鈥怐enis Thompson Inc. to carry out the following project: 22-035 MNI (B159) & Duff (B169) 鈥 Envelope repairs

The scope of work includes repair of the foundations, replacement of stones and replacement/addition of handrails to the exterior stairs of the main entrances to the Lyman Duff Building and the Montreal Neurological Institute, located on University Street.

Published: 6 May 2024

Construction Start: Strathcona Music - Renovation of Pollack Hall

Please be advised that 缅北强奸 has mandated Groupe Geyser to carry out the following project:聽19-167 Strathcona Music Building 鈥 Renovation of Pollack Hall聽

Description: The project consists of the renovation of Pollack Hall to enhance the user experience and improve accessibility.聽

Construction start date:聽May 2024聽

Planned construction end date:聽December 2025聽

Published: 15 Apr 2024

Construction Start: Modification of classroom locks in McConnell Engineering, Trottier and Wong buildings

Please be advised that 缅北强奸 has mandated Les Entreprises NR Brosseau to carry out the following project:聽18-010 Downtown Campus 鈥 Modification of classroom locks in McConnell Engineering, Trottier and Wong buildings.

Published: 12 Apr 2024

Construction Start: Burnside Hall - Modernization of the elevators

Please be advised that 缅北强奸 has mandated Adams Elevators Inc. to carry out the following project:聽17-004 Burnside - Modernization of the elevators.

Construction start date (UPDATED): June 2024

Planned construction end date:聽March 2025

Work schedule:聽Monday to Friday 6 a.m. to 3 p.m.

Published: 8 Apr 2024

Construction Start: Strathcona Music Building - Rehabilitation of building envelope

Please be advised that 缅北强奸 has mandated St-Denis Thompson to carry out the following project:聽16-135 Strathcona Music 鈥 Rehabilitation of building envelope Lot 4.聽聽

Building envelope restoration of South, East and North stone masonry facades. Construction is expected to last three years and will be carried out during the spring, summer and fall periods of 2024, 2025 and 2026.聽

Construction start date: April 2024聽

Published: 3 Apr 2024

Construction Start: Rutherford Building 鈥 CFI IF 2020, Brunner

缅北强奸 has mandated CORENOV to carry out the following project: 19-117 Rutherford Building 鈥 CFI IF 2020, Brunner.

The project consists of renovating room 025 in the first basement of Rutherford Building to accommodate new equipment for the lab. Minor interventions will take place in rooms 003, 024A, 026, 027, 029A,030, B1-HALL2 & B1-HALL5A.

Construction start date:聽March 25, 2024

Published: 21 Mar 2024

Construction Start: Life Sciences Complex - address water leaks in curtain wall

缅北强奸 has mandated F.A.M.G. Contractors to carry out the following project: 14-140 Life Sciences Complex 鈥 Address water leaks in curtain wall.

The work consists of stripping the outer layer of the wall of the mechanical shaft at room 140. The wall will remain stripped for a short period of time to complete the survey before proceeding with reconstruction.

Published: 14 Mar 2024

Construction Start: McIntyre, Stewart Biology, Life Sciences, and Ludmer - repairs in research spaces

缅北强奸 has mandated鈥疌onstruction G.E.P. Inc.鈥痶o carry out the following project:聽McIntyre, Stewart Biology North Wing, Life Sciences, and Ludmer / 23-005 - Repairs in various research spaces.

This project includes necessary repairs in various research spaces across the downtown campus. Repair work includes patching floor finishes, painting walls and ceilings, and new window covers.

Published: 28 Feb 2024

Construction Start: Life Science Complex - CFI BRIF Vidal

缅北强奸 has mandated Corenov to carry out the following project: Life Science Complex / 21-049 - CFI BRIF Vidal.

The project consists of renovating the CL3 laboratory in Life Sciences to accommodate new equipment and facilitate future maintenance work for the facility.

Project manager: Emika Marinacci -聽emika.marinacci [at] mcgill.ca

Published: 29 Jan 2024

Construction Start: McIntyre Medical - Renovation room 334

缅北强奸 has mandated Procova Inc聽to carry out the following project: McIntyre Medical / 23-002聽- Renovation of room 334 (third floor).

The project consists of the renovation of room 334 and the installation of 261 exam desks. It includes the installation of lockers on the second and third floors.

Project manager:聽Wendy Rivera -聽wendy.rivera [at] mcgill.ca

Published: 22 Jan 2024

Pages

Back to top