Ã山ǿ¼é

Sept. 3, 2019 - City work on Peel St. to last until end of September

The City of Montreal has announced that they will continue working on Peel St. throughout the month of September 2019.

The work will be conducted from Monday to Saturday, 7 a.m. to 7 p.m., and the street configuration will remain the same as in the last few weeks:

Classified as: ville de montreal, travaux, construction, rue Peel
°ä²¹³Ùé²µ´Ç°ù¾±±ð:
Publié le: 3 sep 2019

Aug. 14, 2019 - Leacock south terrace closed for next year

Starting the week of Aug. 19, 2019, the Leacock Building south terrace will be closed for construction. Pedestrians will still be able to walk between lower campus and McTavish Street using the McTavish Gates pathway.

The Leacock Building will still be accessible from the stairwell, and Morrice Hall from McTavish Street. Reduced-mobility users will be able to enter Leacock using the east side ground-floor entrance.

Classified as: construction, travaux, mises à jour, pavillon Leacock, Pavillon Morrice
°ä²¹³Ùé²µ´Ç°ù¾±±ð:
Publié le: 14 aoû 2019
Back to top