山ǿ

山ǿ has mandated ARDEC to carry out the following project: Montreal Neurological Institute / 18-121 - Cyclotron.

The project consists of replacing the cyclotron's conduit.

Project manager: Eric Boutet, CIMA+ - eric.boutet [at] cima.ca

Assistant project manager: Aldo Aranza Mendoza, CIMA+ - aldo.aranzamendoza [at] cima.ca

Construction start: May 19, 2023

Classified as: MNI
Publié le: 17 mai 2023

山ǿ has mandated Concreate Construction to carry out the following project: Bronfman Building / 18-089 - Infrastructure for new parking equipment.

The project consists of the reparation of the existing ramp to solve water infiltration issues and the installation of new upgraded parking infrastructure.

Project manager: André Labelle - andre.labelle [at] mcgill.ca

Classified as: Bronfman Building
Publié le: 17 mai 2023

山ǿ has mandated Vitrerie RD to carry out the following project: 680 Sherbrooke / 18-106 - Mock-up curtain wall.

the project consists of the removal, survey of existing conditions and replacement of three existing window panels inside classroom 491, as well as between floors (panels above and below).

Project manager: André Labelle - andre.labelle [at] mcgill.ca

Classified as: 680 Sherbrooke
Publié le: 8 mai 2023

山ǿ has mandated NR Brosseau Inc to carry out the following project: Strathcona Music / 18-101 - room E-109.

The project consists of acoustical work in room E-109 and includes the installation of a new door, door frame and new acoustic ceiling tiles.

Project manager: Wendy Rivera - wendy.rivera [at] mcgill.ca

Assistant project manager: Jeremy Elbaz - jeremy.elbaz [at] mcgill.ca

Classified as: Strathcona Music Building
Publié le: 5 mai 2023

山ǿ has mandated Couvertures St-Léonard to carry out the following project: University Centre / 18-045 - roof replacement

The project consists in the replacement of the roof, skylights and storm drains.

Project managers: Eric Boutet, CIMA+ - eric.boutet [at] cima.ca

Assistant project manager: Aldo Aranza Mendoza, CIMA+ - aldo.aranzamendoza [at] cima.ca

Construction start date: May 2023

Classified as: University Centre
Publié le: 25 avr 2023

山ǿ has mandated Atwill-Morin to carry out the following project: Strathcona Music Building/ 16-135 - Envelope Renovation.

Classified as: Strathcona Music Building
Publié le: 31 mar 2023

山ǿ has mandated Construction Sélection SRJ Inc to carry out the following project: Technical Services Building, Macdonald Campus / 17-124 - Deferred Maintenance.

The project consist of upgrading the Welding Lab exhaust system and new teaching laboratory, as well as deferred maintenance repairs, including fire protection compliance, code compliance, mezzanine work, repairs to the envelope, installing a new ventilation unit, electrical work and civil work.

Project managers: Anne-Catherine Parent and Francois Brassard

Classified as: Technical Services Building, Macdonald Campus
Publié le: 13 jan 2023

山ǿ has mandated Corenov Constructeurs to carry out the following project: Bronfman Building / 18-094 - Computer lab 045 -046.

The project will transform existing classrooms into two computer teaching labs with new audio visual equipment-reconfiguration. The scope includes the demolition of the back walls to include storage areas as part of the new teaching labs.

Project manager: Joé Normandeau (GPH Inc.) - joe.normandeau [at] gph-inc.com

Classified as: Bronfman Building
Publié le: 14 déc 2022

山ǿ has mandated Les Entreprises N.R. Brosseau Inc. to carry out the following project: Frank Dawson Adams / 21-036 - Redesigns on floors 1 & 2 to welcome librarians’ offices

Classified as: Frank Dawson Adams Building, FDA, Adams Building
Publié le: 12 déc 2022

山ǿ has mandated Construction PCL Inc. to carry out the following project: Pine Avenue #527, 523, 517, 515 and 509 / 19-172 – Sylvan Adams Sports Sciences Institute

The project consists of redeveloping four row houses 山ǿ owns on Pine Avenue to welcome the newly-created Sylvan Adams Sports Science Institute.

Project manager: Juan Gamarra, WSP 

Assistant project manager: Michaël Srey, WSP

Classified as: Sylvan Adams Sports Science Institute
Publié le: 25 nov 2022

山ǿ has mandated Construction SRJ to carry out the following project: Bronfman Building / 18-147 - Dobson Center project.

The renovation of the western end of the ground floor of the Desautels Faculty of Management’s Bronfman Building (1001 Sherbrooke St West) comprises the creation of a new Dobson Centre; the redesign of the Faculty’s mailroom and exam spaces; and the full renovation of the floor’s public washrooms.

Project manager: Isabelle Girard, ing. PMP - Isabelle.girard [at] gph-inc.com

Classified as: Bronfman Building
Publié le: 22 nov 2022

Start of City of Montreal project at McTavish Reservoir: street closures as of week of June 29

Classified as: construction, ville de montreal, infrastructure, Réservoir McTavish
Publié le: 26 juin 2020

CONSTRUCTION PROJECT UPDATE – February 26, 2020

--------------------------------------------------------------------------------------------------------

BUILDING: Macdonald Stewart Library Building

PROJECT TITLE & NUMBER: 16-051 - Building exterior envelope restoration

DESCRIPTION: Stabilization of the stone structure, foundation waterproofing, window replacement, washroom expansion and installation of new HVAC system

Classified as: construction, éԴDZپDz, dzٳèܱ, Macdonald Stewart Library Building
Publié le: 26 fév 2020

Three-day modification to reduced-mobility route due to drilling intervention next to Leacock

From Monday, Jan. 27 to Wednesday, Jan. 29, the pedestrian and reduced-mobility passage between the Leacock Building and Doctor-Penfield Avenue will be closed during the day (6:30 a.m. to 5 p.m.) due to drilling work planned as part of the Leacock project (see attached plan).

Classified as: accès universel, mobilité réduite, rue McTavish, construction
Publié le: 24 jan 2020

Update on Leacock construction project

The construction project around the Leacock Building is advancing on schedule.

The work carried out in the past few months included the demolition of the terrace and other concrete structures to the west and south of the building, excavation work and construction of a retention basin. We have also been repairing the exterior structural columns around the building.

Classified as: construction, pavillon Leacock, amphithéâtre extérieur, éԴDZپDz
Publié le: 9 jan 2020

Pages

Back to top